What drives the cost of a reclad in Auckland
How much does a reclad cost in Auckland?
It depends on the house, the cladding and what’s behind it, so we price each one from its own drawings and measure.
The building envelope covers new building wrap, a drained cavity with battens, cavity closers, the new cladding, corners, scribers, custom flashings, painting, and re-jambing or replacing every window and door in those walls. Scaffold, site set-up, roofing and spouting are priced separately.
Be careful with any single per-square-metre figure. It’s a benchmark at best, not a quote. Every house is different.
What’s the difference between a reclad and an overclad?
A reclad strips the old cladding back to the frame and replaces it. An overclad leaves the existing wall in place and builds a new cavity and cladding over it.
An overclad suits a sound, solid substrate such as block. A reclad is the answer when the framing behind the cladding has to be opened up, checked and repaired. Your surveyor and designer should recommend which one, and we’ll test that against what we find on site.
What drives the cost of a reclad?
Five things move the number more than anything else.
- The cladding system. Timber weatherboards, fibre-cement and plaster systems all differ in material, labour and paint.
- Joinery. Every window and door is either re-jambed to suit the new cavity or replaced. Each opening also gets its own head and sill flashings, measured and folded to suit.
- Corners, junctions and openings. A plain wall is quick. Corners, raking windows, decks and roof junctions take the hours.
- Scaffold. Every elevation needs it for the whole job.
- What’s behind the cladding. This is the one nobody can price exactly until the wall is open.
What happens if you find rotten framing when the cladding comes off?
It gets assessed and repaired before anything is closed back in. That’s the whole point of opening the wall.
No one can see inside a wall before it’s opened, so we don’t hide this risk inside a lump sum. Our proposals carry it as a clear, separate allowance, such as a contingency on window re-jambs or a provisional sum for framing repairs. Anything found is priced openly, line by line, before the work is done.
Do you need a building consent for a reclad?
Most reclads need a building consent. Whether yours does depends on the scope, and your designer or the council will confirm it before work starts. Consent adds design time, council processing time and fees to the project.
How long does a reclad take?
It depends on the size and complexity of the house, and we’ll give you a programme for yours. Larger or more complex houses take longer.
Before work starts on site, you need time for design, consent and joinery. We order new windows early, so they arrive while the scaffold is still up.
Is it cheaper to repair than to reclad?
Sometimes, yes. If the cladding itself is sound and only the edges have failed, a targeted repair can cost a fraction of a full reclad.
Every square metre of cladding you take off is a square metre you can’t put back exactly as it was. That’s where the cost and the surprises live. A good builder will tell you honestly which side of that line your house sits on.
Why is the cheapest reclad quote risky?
Because the cheapest quote is usually the one that has left something out. The gaps show up in the same places: scaffold priced for too few weeks, no allowance for rotten framing, stock flashings where custom ones are needed, joinery left as “by others”, or no painting at all.
When those items come back as variations, the cheap quote stops being cheap. When you compare quotes, ask each builder:
- What’s included, and what’s excluded?
- How many weeks of scaffold are allowed?
- How will rot or hidden damage be priced if it’s found?
- Are the windows re-jambed, replaced, or not included?
- Is painting included?
If a quote can’t answer those clearly, it isn’t really a price.
How does Luxor price a reclad?
We measure every elevation, count every lineal metre of board, batten and flashing, and price the job in the order it will be built. Assumptions, exclusions and risks are written down, not left for later.
Allowances for unknowns sit in the open where you can see them. Our builder’s margin is shown on the summary. You’ll know what you’re paying for before you sign, and how any change will be priced if the wall tells us something new.
Weighing it up
If you’re weighing up a reclad, an overclad or a repair, we’re happy to walk the house with you and tell you honestly which one it needs.